A few years back, a small-sized processing plant near Pune was struggling with inefficiency. It was common for equipment to be down, blueprints were old, and nobody really knew if the system was operating at full capacity. The head of operations, Ravi, saw that the plant hadn’t changed much in
Month: May 2025
Total 2 Posts
Remember that project you were so optimistic about? The one that began with such promise? Then there was a snag, a critical misalignment, unplanned rework, and the pressure was building day by day. You’re not alone if coordination glitches and the intricacies of BIM have thrown a wrench into your